CATALINA ISLAND

static1.squarespace

Multi-phase contaminated soil removal for the Long Beach Unified School District at an elementary/middle/high school located on Catalina Island.  Services include the excavation, of 3,530 tons of arsenic and lead impacted soil.  Soil was loaded onto trucks and transported to a barge at the docks, then transported from the island to the Port of Long Beach, and loaded back onto trucks for transportation and ultimate disposal at an approved Class 1 facility.  Activities also included relocating/re-installing portable classrooms, and site restoration. The site had been previously used as a landfill prior to the school being established at the location.